(860) 923-2920

Thompson, CT

Phase 1 Construction Photos

Phase I of a 32 lot subdivision, designed and permitted by J & D. Construction by Lavallee Construction, LLC.

The subdivision was designed with the latest LID techniques, including a roof top infiltration unit at each house to infiltrate roof runoff and sediment forebays and water quality basins to protect the wetlands from road runoff.